Determination of Optimal Reserve between Two Machines in Series with the Repair Time Has Change of Parameter after the Truncation Point

Main Article Content

S. Sachithanantham, T. Vivekanandan

Abstract

In inventory control, suitable models for various real life systems are constructed with the objective of determining the optimal inventory level.  A new type of inventory model using the so-called Setting the Clock Back of Zero (SCBZ) property is analyzed in this paper. There are two machines M1 and.M2  in series and the output of M1 is the input of M2. Hence a reserve inventory between M1 and M2 is maintained. The method of obtaining the optimal size of reserve inventory, assuming cost of excess inventory, cost of shortage and when the rate of consumption of Mis a constant, has already been attempted.  In this paper, it is assumed that the repair time of M1  is a random variable and the distribution of the same undergoes a parametric change after a truncation point X0 , which is taken to be a random variable.  The optimal size of the reserve inventory is obtained under the above said  assumption . Numerical illustration is also provided

Article Details

Section
Articles